Manifest docs Sign in

Tutorial

Make your first SAP B1 bill of materials

In this tutorial we upload a ZIP of SolidWorks drawings and build a bill of materials (BOM) for one sub-assembly. At the end you will have SAP-B1-BOM.xlsx on your computer, made for an order of 75 assemblies.

It takes about 10 minutes. You need a Manifest account and a ZIP of SolidWorks files for one machine. The screenshots use a sample machine, CONVEYOR LINE 3 LABEL APPLICATOR ASSY. Its names, codes and sizes are made up, so your screens will show your own.

No ZIP? If your workspace already has a sample project on the Projects page, click it, click 2 VALIDATION in the step bar, then continue at step 4.

If you prefer to watch first, the tutorial video shows the same steps.

  1. Sign in

    Go to manifest.jetdraftai.com. Enter your email and password, then click Sign in.

    You should see the Machine BOMs page. It lists the projects of your team, newest first.
    The Machine BOMs page with one project and a New project button
  2. Start a new project

    Click New project in the top-right corner.

    You should see Generate a bill of materials and a box that says Drop your SolidWorks ZIP or RAR here.
    The new project screen with a Choose ZIP or RAR file button
  3. Upload the ZIP

    Drag your ZIP or RAR onto the box, or click Choose ZIP or RAR file and pick it. It must hold the 3D files: the assembly (.SLDASM) with its parts (.SLDPRT), or a complete machine vault. Drawings are not needed.

    You should see Generating BOM with three lines: Unpacking the vault, Detecting the root assembly, and Resolving the BOM graph. For the sample it takes under a minute. Then the Select assemblies screen opens.
    Generating BOM progress with three stages
  4. Choose one sub-assembly

    The Sub-assemblies list shows every sub-assembly Manifest found, with its count of fabricated and purchased parts. Nothing is ticked yet.

    Tick S01000 — LABEL HEAD ASSY.

    You should see the row highlighted, with 15 fabricated · 29 purchased. The RUN VALIDATION → button turns blue.
    Select assemblies screen with S01000 ticked and RUN VALIDATION active
  5. Run validation

    Click RUN VALIDATION →. Manifest checks each part in the sub-assembly and calculates the BOM.

    You should see Running validation for a few seconds. Then the 3 CREATION step opens with 17 items in this run.

    A dialog also opens: 1 decision needed before this output is trusted. One part, P01046, has no material on any drawing. Manifest leaves it blank instead of guessing. We will not answer it now. Click Later.

    Dialog: 1 decision needed before this output is trusted, with Later, Review in the tab, and Save and recalculate buttons
    To answer decisions like this one later, see Answer a decision the output needs.
  6. Look at the BOM

    The BOM tab shows the rows exactly as they will appear in the Excel file. Each row names a parent item, the quantity per assembly, and a child item.

    You should see SALES ORDER QUANTITY: 1 above the table. The first rows list what S01000 contains: 14 fabricated plates and parts, then the purchased parts. Scroll down: each fabricated part appears again as a parent, with its raw material, stock size (T, L, W), supply type, and weight.

    One row has no weight: P01046, the part without a material. That is the decision from the dialog.

  7. Set the order quantity to 75

    A new project starts with a quantity of 1 assembly. Our order is for 75.

    1. Click the Assumptions tab.
    2. In Quantity · assemblies, enter 75.
    3. Click Save & recalculate.
    You should see the button change to Recalculating.... The old output stays on screen until the new one is ready, usually within a few seconds.
    Assumptions tab with 75 in the quantity field and a Save and recalculate button
  8. Open SAP LOAD

    In the step bar at the top, click 4 SAP LOAD.

    You should see SALES ORDER QUANTITY: 75. Scroll the table to the right: the TOTAL QUANTITY column now shows 75 for each part.
    SAP LOAD screen with download buttons and the BOM for quantity 75
  9. Download the SAP B1 BOM

    Click SAP B1 BOM (.xlsx).

    You should see your browser save SAP-B1-BOM.xlsx, about 18 KB for the sample.
  10. Open the file

    Open SAP-B1-BOM.xlsx in Excel.

    You should see six sheets. The first, BOM, starts with SALES ORDER NUMBER in A1 and SALES ORDER QUANTITY 75 in row 2. The column headers are in row 3. The file holds values only, with no formulas, so SAP B1 can import it.

What you made

You turned a folder of SolidWorks drawings into a SAP B1 bill of materials for 75 assemblies. You did not type a single part code. You also saw how Manifest treats a value it cannot read: the cell stays blank, and a decision waits for you.

Next steps: