How-to guides
How to get common tasks done
Each guide solves one task. They assume you know the four steps. If you do not, start with the tutorial.
Upload a new version of a machine
A brand-new upload becomes its own project. Earlier projects and their downloads do not change.
- On Projects, click New project.
- Drop the new ZIP or RAR on the box, or click Choose ZIP or RAR file.
- When Select assemblies opens, continue as usual.
If the ZIP is a revision of a project already in Manifest and you want to see what changed, use Update a project instead. That keeps the two versions linked and produces an action list.
Update a project and get an action list
When a drawing set is revised, update the existing project with the new ZIP or RAR. Manifest scans the revision and compares it against the previous version, so you get the exact list of what to add, remove, or update in SAP. The original version stays as it was. To see it first, watch the 73-second video.
- On Projects, find the project you are revising.
- Drag the revised ZIP or RAR onto that project row — the row shows Drop .zip or .rar here to update project — or click the row's Update button and choose the file.
- Wait for the scan to finish. The screen opens on the revised version.
- Click the Action list tab. The number on the tab is how many changes were found.
Each row has one of three actions: ADD (blue), REMOVE (red), or UPDATE (yellow). For an UPDATE, the Field column says what to change: Material, Dimension, Quantity, Precision, or Surface treatment. Each row also shows the item code, the value in version 1, and the value in version 2. Below the table, a Drawing and part files section lists every drawing added, removed, or modified — so a new part drawing shows up even before its part is placed in an assembly.
Click Action list (.xlsx) to download the workbook. It is a separate file with two sheets, ACTION LIST and FILE CHANGES; it does not change the SAP B1 BOM file.
To tell versions apart on the index, use the date and the Ref. code on each card. If you no longer need an old version, delete it.
Change which sub-assemblies are in the BOM
- Open the project and click 2 VALIDATION in the step bar.
- Tick or untick sub-assemblies. You need at least one.
- Click RUN VALIDATION →.
A vault without sub-assemblies shows None in this vault. In that case, click RUN VALIDATION → with nothing ticked to use the whole vault.
Set the sales order quantity
The quantity changes total parts, supply type, stock allowances, and weights. A new project starts at 1 assembly.
- On 3 CREATION or 4 SAP LOAD, click the Assumptions tab.
- Enter the number of assemblies in Quantity · assemblies.
- Optional: tick Mark this quantity as reviewed.
- Click Save & recalculate.
Wait until the button no longer says Recalculating.... The downloads then use the new quantity.
Use your own sales order number
Manifest makes a placeholder such as SO-20260924-d7e6af2dbe451395. It is not an order from SAP B1.
- Click the Assumptions tab.
- Replace the text in Reference · replace if your SAP workflow requires it.
- Click Save & recalculate.
Answer a decision the output needs
A decision appears when the drawings leave a value empty or unclear. Until you answer it, that cell stays blank. The download still works either way.
- Open the list. Either the dialog N decisions needed before this output is trusted opens by itself, or you click the Assumptions tab. The number on the tab is the count of open decisions.
- To see the source, click See the drawing. If the part has no drawing of its own, click See the assembly drawing. Not every row has these buttons.
- Choose one answer for each row:
- Use "…" accepts the text that Manifest read on the drawing.
- Enter a value opens a box. Type the value as written on the drawing, or a code from the Materials library. Then click Use this value.
- Keep blank records that the cell stays empty. The gap stays listed as a note.
- Click Save & recalculate. You can save after one answer; the rest can wait.
If a value cannot go into the output, it is listed under Saved decisions not applied, with the reason. For example, the part may have no drawing sheet.
Download the files for SAP B1
- Open the project and click 4 SAP LOAD.
- Check SALES ORDER QUANTITY above the table. If it is wrong, set the quantity first.
- Click SAP B1 BOM (.xlsx). If your SAP B1 team also creates items, click Items — purchased and Items — fabricated.
- Send the files to the person who runs your SAP B1 import. Manifest does not upload to SAP B1.
For what each file contains, see Downloads.
Add or edit a material
Density, allowances, and process flags come from the Materials library, not from the drawings. You need the Owner, Admin, or Account manager role.
- In the left menu, click Materials.
- Click Add material. To change an existing material, click Edit on its row.
- Fill in Material code, Description, Density · kg/mm³, the two allowances, and the three flags.
- Click Save material.
- Open each project that should use the new values and click Save & recalculate on its Assumptions tab.
Existing downloads keep the values they were made with. A material that a project uses shows Deletion unavailable.
Add a teammate
You need the Owner, Admin, or Account manager role. An Admin can add Members only.
- Open the account menu in the top-right corner and click Team and access.
- Under Add a teammate, enter their Name and Email and pick a Role.
- Click Add teammate.
Manifest creates the account and emails your teammate their email address and a generated password. They can change the password under Account and security after they sign in. If the address already has a Manifest account, its password stays the same, and the email tells them to sign in as usual. If the email cannot be sent, nobody is added, and you can try again.
Change your password
- Open the account menu and click Account and security.
- Under Change password, enter your current password and the new one twice. Use at least 8 characters.
- Click Change password.
Every session signs out, including this one. Sign in again with the new password.
Reset a forgotten password
- On the sign-in page, click Forgot password?.
- Enter your email and click Email me a reset link.
- Open the email Reset your Manifest password and click Choose a new password.
- Enter the new password twice and click Save new password.
- Sign in with the new password.
The link works once and expires after 30 minutes. If it has expired, request a new one. If no email arrives, check your spam folder.
Delete a project
- On Projects, click Delete on the project card.
- At Delete this project and its exports?, click Delete project. To stop, click Keep project.