Reference
Screens, files, columns, and roles
Facts to look up. This page describes Manifest version 0.0.4 and the SAP B1 BOM template it writes.
Screens
| Screen | Address | Purpose |
|---|---|---|
| Machine BOMs (Projects) | /signin#/ | Lists the team's projects, newest first. Search by name or project reference. |
| Generate a bill of materials | /signin#/new | Uploads a ZIP or RAR and starts a project. Step 1 UPLOAD. |
| Select assemblies | /signin#/job/<id>/validate | Chooses sub-assemblies and runs validation. Step 2 VALIDATION. |
| Project name | /signin#/job/<id>/create | Shows the BOM and every supporting tab. Step 3 CREATION. |
| SAP LOAD | /signin#/job/<id>/sap | Downloads, with the BOM, Material, and Assumptions tabs. Step 4 SAP LOAD. |
| Materials Library | /signin#/materials | Materials shared by every project of the team. |
| Team and access | /signin#/team | Members, roles, and adding teammates. |
| Account and security | /signin#/account | Your teams, password, and sign-out. |
| Billing | /signin#/billing | Plan and subscription. The design-partner workspace needs no payment. |
Project tabs
The CREATION step shows all tabs. SAP LOAD shows BOM, Material, and Assumptions.
| Tab | Contents | Same as workbook sheet |
|---|---|---|
| BOM | Every BOM row, with the sales order number and quantity above it. | BOM |
| Material | The material values this output used. Read-only. | MATERIAL |
| Components | Purchased parts, one line per item code, with the total quantity for the order. | SUPPLEMENTAL COMPONENTS |
| Raw materials | Stock to buy, one line per fabricated part, with stock size, quantity, and weight. | SUPPLEMENTAL RAW MATERIALS |
| Assumptions | Order quantity, order reference, open decisions, source gaps, and the decision log. The number on the tab is the count of open decisions. | None |
| Purchase summary | Plate area per material, and the grand total as a percentage of the mother plate. | None |
| Drawings | The drawing sheets of the project, rendered as images. | None |
| Data audit | Each field found in the files, how often it is filled, and its most common values. | None |
| Other data | File counts by type (SLDPRT, SLDASM, SLDDRW) and the tables found on drawing sheets. | None |
Downloads
The buttons appear on CREATION and SAP LOAD. Each link is fixed to one output: after a recalculation, the page shows new links.
| Button | File name | Contents |
|---|---|---|
| SAP B1 BOM (.xlsx) | SAP-B1-BOM.xlsx | The BOM in your SAP B1 BOM template. Values only. See The SAP B1 workbook. |
| Full BOM (.xlsx) | Manifest-BOM.xlsx | A working file with 12 sheets, including ITEM LIST, SUB-ASSY, ITEM AUDIT, the levels L0 to L3, and PURCHASE SUMMARY. Not for SAP import. |
| Items — purchased | item-master-purchased.csv | Columns: ITEM CODE, ITEM NAME, MATERIAL, TOTAL QTY, USED IN. |
| Items — fabricated | item-master-fabricated.csv | Columns: ITEM CODE, ITEM NAME, MATERIAL, L_MM, W_MM, T_MM, SHAPE, TOTAL QTY, USED IN. |
| Review report | Manifest-review-report.json | Assumptions, decisions, and source notes in JSON, for audit. |
The SAP B1 workbook
SAP-B1-BOM.xlsx has six sheets, in this order. No sheet holds a formula or a defined name.
| Sheet | Layout |
|---|---|
| BOM | A1 SALES ORDER NUMBER, B1 the number. A2 SALES ORDER QUANTITY, B2 the quantity. Row 3 has the column headers. Rows 4 and down hold the BOM. See BOM sheet columns. |
| MATERIAL | One row per material: ITEM_CODE, ITEM DESCRIPTION, DENSITY, HARDENING, STRESS, RAW, P_6F, PRECISION. |
| SETTINGS | The lookup lists of the template: Supply Type, Precision Finish, and Surface Finish. |
| SAP B1 BOM Format | The BOM as a SAP B1 tree: ParentKey, LineNum, ItemCode, Quantity, Warehouse, IssueMethod. Below the tree, a helper block gives each item's finished dimension for the item master. |
| SUPPLEMENTAL COMPONENTS | Purchased parts to order. Row 1 names the sales order. |
| SUPPLEMENTAL RAW MATERIALS | Raw stock to order, with stock size and weight. Row 1 names the sales order. |
BOM sheet columns
The BOM sheet has two kinds of rows:
- Assembly rows. The parent is a sub-assembly, such as S01000. The child is a fabricated or purchased part.
- Raw material rows. The parent is a fabricated part, such as P01023. The child is its material, such as SUS303. These rows carry the size, supply type, and weight.
A blank cell means the source did not give the value. Manifest does not fill it with a guess.
| Column | Header | Meaning |
|---|---|---|
| A | PARENT ITEM CODE | The item that contains the child. |
| B | PARENT ITEM DESCRIPTION | Name of the parent. |
| C | QTY PER ASSEMBLY | Parent quantity per assembly. |
| D | CHILD ITEM CODE | The part, or on raw material rows, the material code. |
| E | CHILD ITEM DESCRIPTION | Name of the child. |
| F | QTY NEEDED | Child quantity per parent. |
| G–I | T, L, W | Finished thickness, length, and width in mm. |
| J | FINISH DIMENSION | Finished size as text. |
| K | PRECISION | Precision finish from the drawing. |
| L | SURFACE TREATMENT | Treatment from the drawing, such as a coating or hardness. |
| M | (no header) | Empty separator column of the template. The app hides it. |
| N | TOTAL QUANTITY | Quantity for the whole sales order. |
| O–P | UNIT VOLUME, TOTAL VOLUME | Volume per piece and for the order, in mm³. |
| Q | SUPPLY TYPE | How the stock is bought, such as PRE-MILLED 6F. |
| R–T | Hardening, Stress Relief, Surface Finish Output | Process flags from the Materials library and the drawing. |
| U–W | Grinding Allowance, Raw Allowance, Pre-Milled Allowance | Extra stock in mm, from the Materials library. |
| X–Z | T1, L1, W1 | Stock size to buy, in mm: the finished size plus allowances. |
| AA | UNIT WEIGHT KG | Stock weight per piece. |
| AB | TOTAL WEIGHT | Stock weight for the order. |
| AC | PO ITEM DESCRIPTION | Text for the purchase order line. |
Decision answers
| Button | Result after Save & recalculate |
|---|---|
| Use "…" | The text read from the drawing goes into the output. |
| Enter a value | Your value goes into the output. If no drawing sheet carries the part, the value is recorded under Saved decisions not applied instead. |
| Keep blank | The cell stays empty. The row leaves the decision list and stays under Source and material gaps. |
| See the drawing, See the assembly drawing | Shows the drawing sheet. Changes nothing. |
Roles
Each person has one role per team. Projects and materials belong to the team.
| Can | Member | Admin | Owner | Account manager |
|---|---|---|---|---|
| Upload, validate, recalculate, and download | Yes | Yes | Yes | Yes |
| Read the Materials library | Yes | Yes | Yes | Yes |
| Add, edit, or delete materials | No | Yes | Yes | Yes |
| Add people and change roles | No | Members only | Owner, Admin, Member | Owner, Admin, Member |
| Manage billing | No | No | Yes | No |
| Create another team | No | No | No | Yes |
Account manager is the role of the Jetdraft AI staff who run the pilot. Nobody can give this role, remove it, or change it from the app.
Limits
| Item | Limit |
|---|---|
| Upload | One .zip or .rar file per project, up to 1 GB. A .zip that holds only a .rar is opened too. Multi-part .rar sets are not accepted. |
| Password | 8 to 128 characters. |
| Password reset link | Works once. Expires after 30 minutes. A newer link cancels the older one. |
| Reset emails | 3 per email address in 15 minutes. |
| Password change or reset | Signs the account out on every device. |
| Calculations | One at a time per project. |