Explanation
How Manifest works
This page explains the ideas behind the screens. You do not need it to use Manifest, but it helps when a result surprises you.
Manifest reads the SolidWorks files directly
A SolidWorks vault holds three kinds of files. Part files (SLDPRT) describe single parts. Assembly files (SLDASM) say which parts go together, and how many. Drawing files (SLDDRW) carry the sheets that people read: title blocks, tables, sizes, material, and treatment.
Manifest opens these files itself. It does not need SolidWorks installed, and nobody exports anything by hand. From the files it finds the root assembly, follows every assembly down to its parts, and builds one tree for the machine. That is the Resolving the BOM graph line you see after an upload.
Each part lands in one of two groups. Fabricated parts are made from stock, in-house or by a subcontractor, so they need a material and a size. Purchased parts are bought as they are, such as bolts, bearings, and cylinders. The counts next to each sub-assembly, such as 15 fabricated · 29 purchased, come from this split.
Nothing is guessed
Drawings are made by people, and people leave fields empty. A part may have no material, or a material that the library does not know. Manifest could fill such a gap with a likely value. It leaves the gap on purpose.
A wrong number in a bill of materials is expensive. It orders the wrong stock, and nobody notices until the parts arrive. A blank cell is cheap: anyone can see it in the workbook or in SAP B1, and ask. So when a value is missing, the cell stays blank, every value that depends on it stays blank too, and the gap is listed on the Assumptions tab with the reason.
When a field is empty in the file data, Manifest can read the text on the drawing sheet with an AI model. That reading is shown to you as a decision, next to the drawing. It goes into the output only when a person clicks Use or enters a value. Every saved change goes into the decision log, with who made it and when.
The review never blocks the download
You can download the BOM right after validation, even with decisions open.
Often the missing answer is not in the drawings at all. It sits with a designer, a supplier, or a purchasing team. If an open question stopped the download, one missing material would hold up the whole BOM. Instead, Manifest gives you the whole file now and shows how many decisions are open. You choose whether the file is good enough for today's purpose.
The same rule applies to the order quantity. A new project uses 1 assembly and marks it as not reviewed. It is a starting value, not a claim about your order.
What a recalculation does
When you click Save & recalculate, Manifest saves your answers and runs the calculation again from the start. The result is a new, complete output. Until it is ready, the old output stays on screen and stays downloadable.
Each output keeps its own files. Download links name the output they belong to, so a link that you sent yesterday still gives yesterday's file. If a calculation fails, the previous output stays in place. You never get a half-written workbook.
Where material values come from
Drawings name a material, such as SUS303. They do not give its density or how much extra stock to buy. Those values come from the team's Materials library.
Each output keeps a copy of the library values it used. That copy is the MATERIAL sheet and the Material tab. When someone edits the library, finished outputs do not change. A project picks up the new values only when you recalculate it. This way a workbook always agrees with the numbers inside it.
Why the SAP B1 workbook has no formulas
In a typical SAP B1 BOM template, many columns are calculated with Excel formulas. SAP B1 cannot import formulas. So Manifest does the arithmetic itself and writes only the results, in the same sheets and columns as the template. The SAP B1 import can map the columns as before, and every number in the file is the number that SAP B1 receives.
Manifest stops at the file. The import into SAP B1 is done by your SAP B1 team or partner, who knows your database and its rules.
Teams keep work apart
Projects and materials belong to a team, not to a person. Everyone on the team sees the same projects and the same library. A person can be on more than one team, for example one team per client, and nothing moves between teams. Deleting a project removes its uploaded files and every output made from them.